Skip to content

Runbooks and checklists

Status: placeholder — runbook mapping and checklists will be populated in the next documentation revisions.

This LLD summarizes the operational guides required to run the air-gapped factory and links to the detailed runbooks.

Minimum runbooks

Checklists

  • Each runbook should include entry/exit criteria and a validation checklist.
  • Maintain a pre-flight checklist covering registry reachability, mirror freshness, and free disk space on builders.
  • Maintain a post-flight checklist ensuring BOM artifacts, logs, and digests are published to results storage.